Tangshan-Caofeidian Expressway Subgrade Project Lot TC-8
时间:2018-11-14 source:本站

Commencement time:2007-1-1

Completion time:2008-1-8

Introduction:The total length of the line is 8.300km, and there are 1 large bridge, 2 overpass bridges, 8 medium bridges, 7 small bridges and 1 stayed-cable bridge in total.

 