Tianjin-Shanwei Expressway Project
时间:2018-11-14 source:本站


Commencement time:2007-12-24

Completion time:2009-9-28

Introduction:The project is Qingbowa interchange engineering of the third lot of Tianjin segment engineering of Tianjin-Shanwei expressway, and Qingbowa interchange engineering is the semi-direct connection turbine type three-layer interchange. The original country road is the ground floor, Jinjin expressway is the second floor, Tianjin-Shanwei main line is the third floor, and other ramps are uniformly distributed in the second and the third floors. The total length of road within the contract scope is 3.14km, and the total length of the bridge is 4.48km.