Commencement time:2008-12-25
Completion time:2010-5-20
Introduction:The total length of the lot is 6.2km, and there are a Henan Road Bridge, a freight yard railway bridge and a pump station at Xianfeng Road. The rest are roads.
联系方式
地址:Airport Construction Engineering Co.,Ltd
电话:022-66708712
传真:022-66708713