Zhangjiakou-Shijiazhuang Expressway Shijiazhuang Segment Lot ZS1
时间:2018-11-14 source:本站


Commencement time:2005-11-20

Completion time:2006-12-20

Introduction:The total length of the route is 4.013km, and the main construction projects include the subgrade, bridge, culvert, cross engineering and so on.


津ICP备 12005657号-1

工会抖音公众号

微信公众号

联系方式

地址:Airport Construction Engineering Co.,Ltd

电话:022-66708712

传真:022-66708713

022-66708712

yhsgs@cccc-yhs.com