Project of Zhenli Expressway Lot ZL-ZJ1
时间:2018-11-14 source:本站

Commencement time:2003-12-7

Completion time:2006-5-30

Introduction:

The project belongs to the pilot test section engineering, the total length is 5.812km, the subgrade earthwork is 1,061,493m3, the lime is 81,146t, and the special subgrade treatment line is 1,112m long. Including earth filling (equal load) preloading for 156m, paving of sand cushion + geotextile preloading for 325, paving of gravel cushion layer + geogrid for 91m, paving of geogrid for 130m, replacement of gravel soil for 80m and wet-spray pile treatment road section for 60m.