Commencement time:2007-4-30
Completion time:2007-4-30
Introduction:the total length is 5729.7m, the total length of the bridge is 1748.3m, and the total length of the road is 3981.4m.
上一条:Fenhe River-crossing Institution Landscape Bridge Project of Changfeng Culture Island of Taiyuan
下一条:Jiefang South Road Interchange Engineering of Tianjin Expressway Project Return
联系方式
地址:Airport Construction Engineering Co.,Ltd
电话:022-66708712
传真:022-66708713
022-66708712
yhsgs@cccc-yhs.com