Wagon Tippler Shed Project of Coal Terminal of Qingdao Qianwan Port
时间:2018-11-15 source:本站


Commencement time:1989-1-1

Completion time:1992-1-1

Introduction:The project foundation is the weathered rock subject to blasting, and has the cast-in-place reinforced concrete box-shaped structure. The plane size is 46.1*23.2m, and the floor burial depth is 16.238m.

 



津ICP备 12005657号-1

工会抖音公众号

微信公众号

联系方式

地址:Airport Construction Engineering Co.,Ltd

电话:022-66708712

传真:022-66708713

022-66708712

yhsgs@cccc-yhs.com