Commencement time:1989-1-1
Completion time:1992-1-1
Introduction:The project foundation is the weathered rock subject to blasting, and has the cast-in-place reinforced concrete box-shaped structure. The plane size is 46.1*23.2m, and the floor burial depth is 16.238m.