Wagon Tippler Shed Project of Coal Terminal at Nanjiang Port Area of Tianjin Port
时间:2018-11-15 source:本站


Commencement time:1995-5-1

Completion time:2000-9-30 

Introduction:The diaphragm wall of the project is 32m high, including 44 × 5m slot sections. The diameter of the diaphragm wall is 68m, and the wall is 1.0m thick.

 



津ICP备 12005657号-1

工会抖音公众号

微信公众号

联系方式

地址:Airport Construction Engineering Co.,Ltd

电话:022-66708712

传真:022-66708713

022-66708712

yhsgs@cccc-yhs.com