Qingdao Port Qianwan Port Area Phase II Project
时间:2018-11-14 source:本站


Commencement time:1996-3-20

Completion time:2000-12-11


Introduction : the project includes: container yard and bus road engineering, 9-16# substation project, wharf water supply and drainage pipe network engineering, production scheduling building engineering of the operation area, container gate check bridge engineering and so on.



津ICP备 12005657号-1

工会抖音公众号

微信公众号

联系方式

地址:Airport Construction Engineering Co.,Ltd

电话:022-66708712

传真:022-66708713

022-66708712

yhsgs@cccc-yhs.com