Commencement time:2007-7-1
Completion time:2007-12-25
Introduction : The intake engineering mainly includes three parts of intake pump room and forebay, control room and power distribution room as well as diversion culvert. The discharge port structure includes: a double-hole drainage culvert, a gate well, a four-hole drainage ditch and a stilling basin. The large sand-filled bag cofferdam structure is adopted for the cofferdam engineering, including the south, west and north separation dikes, 186.57m long in total.