Shanghai Pudong International Airport Project
时间:2018-11-21 source:本站
Commencement time:1997-5-25
Completion time:1999-2-8
Introduction:The project is within the range of Lot II of the
airport road, mainly including 90-area and non-90-area earthwork engineering,
B1 and B2 drainage engineering, road pavement engineering, fire pipeline
engineering, embedded sleeve engineering and the corresponding coordination
engineering.