Commencement time:2003-8-1
Completion time:2004-8-1
Introduction: The bank revetment project is divided into the internal bank revetment engineering and external bank revetment engineering. The section with riprap sloping dike structure is adopted for the external bank revetment, and the length of the bank revetment of the section is 1458.815m. The length of the internal bank revetment is 902.357m. The foundation treatment area is 61457m2, and the backfill soil is 86040m3.
联系方式
地址:Airport Construction Engineering Co.,Ltd
电话:022-66708712
传真:022-66708713