Beijing-Shanghai High-Speed Railway THTJ-6 Project
时间:2018-11-16 source:本站
.
Commencement time:2008-2-18
Completion time:2009-3-30
Introduction: the engineering task assumed by our company is
mainly the offline engineering: total length of 11.845Km; mainly including: a
station and a bridge. "A station" is Wuxi East Elevated Station with
total length of 3.43Km; "a bridge" is Wuxi East Grand Bridge Section
of Danyang-Kunshan grand bridge with total length of 8.415Km. The offline
engineering mainly includes the bored pile, bearing platform and pier body.