Beizhan Station of Tianjin Metro Line 3 Lot 13
时间:2018-11-15 source:本站
Commencement time:2007-6-1
Completion time:2011-5-1
Introduction: the total building area of the station is
12988m2, the building area of the main body of the station is 9591m2, the building
area of the station hall layer is 4422 m2, the building area of the platform
floor is 4422 m2, and the building area of third floors underground is 747 m2;
the auxiliary building area of the station is 3397 m2. The main body of Beizhan
Station is the two-layer island station (three layers locally). The underground
floor is the station hall layer, the second floor underground is the platform
floor, and the third floor underground is the reserved transfer node with Line
6. The total length of the station is 197m, the width of the standard section
is 20.5m, and width at the transfer node is 26.5m; the calculated platform
length is 118m, and the platform width is 12m.