Rainwater Pump Station Project of Shanghai Pudong International Airport
时间:2018-11-15 source:本站


Commencement time:1998-2-28

Completion time:1999-4-15

Introduction:The building area of the project is 25,000m2, and the project includes the dry transformer, 10KV high-voltage switchgear, AC panel, signal panel, MNS low-voltage power distribution cabinet, axial-flow submersible pump and flap valve, PCL cabinet, headstock gear, cast iron inlaid copper gate, grille cleaner, low-voltage power control cable and so on. The project level is excellent.