Jingtang Port 30,000,000DWT Coal Berth 32#-34# Wagon Tippler Shed Community Project
时间:2018-11-15 source:本站
Commencement time:2006-2-1
Completion time:2006-10-30
Introduction:Pavement of the road and site of
the wagon tippler shed community; railway of the wagon tippler shed community
(0.56km); wagon tippler shed and corridor underground structure (including the
envelope structure and locating car, truck stacker, wheel clamp and other
foundations); 5 single buildings (wagon tippler shed, CD1 and CD2 control
rooms, 3# substation, fan room of wagon tippler shed); civil engineering,
lightning protection earthing, strong current, weak current, water supply and
drainage and HVAC works of the production, auxiliary production and auxiliary
living buildings of the wagon tippler shed community.