Land Foundation Reinforcement Project in East of Nanjiang Port Area of Tianjin Port
时间:2018-11-15 source:本站
Commencement time:2004-10-16
Completion time:2005-8-10
Introduction:Land Foundation Reinforcement
Project in East of Nanjiang Port Area of Tianjin Port. The total area is
312403m2, and it is divided into 13 areas. The average elevation of the current
mud surface of the site is +4.5m, and the completion elevation shall be +5.7m.
Area 13 is the replacement area with area of 2464m2; 9, 10, 11 and 12 are
vacuum preloading areas with area of 92,317m2; area 1-8 are vacuum combined
surcharge preloading areas with area of 217,622m2.