Commencement time:2004-6-10
Completion time:2005-3-10
Introduction:The total area of soft foundation reinforcement of the project is 256,680m2, including 13 areas. The average elevation of the current mud surface of the site is +4.5m, and the completion elevation shall be +5.7m. Area 1 is the replacement area with area of 1920m2; area 2, 3, 4 and 6 are vacuum preloading areas with area of 75,240m2; area 8-15 are the vacuum combined surcharge preloading areas with area of 179,520m2.