Commencement time:2002-12-2
Completion time:2004-10-1
Introduction:The total length of Nouakchott-Nouadhibou highway of Mauritania is 480km, and there are four lots in total. The total length of the third lot constructed by us is 120km, and ATTM, AGRINEQ and us constitute the consortium to jointly contract the project. The main items in the project include: surface cleaning, filling, excavation, 25cm thick structure layer, road shoulder, 5cm thick asphalt concrete, ford, culvert and so on.