Akjoujt-Attar Highway of Mauritania
时间:2018-11-15 source:本站


Commencement time:1997-7-15

Completion time:1999-11-11

Introduction:The total length of the project is 124km, and the road is 6m wide. A 24-hole 80m long culvert, two 6-hole 20m long culverts, and concrete ford of 850 linear meter are constructed. The whole line is located in the desert region in Western Sahara Desert, including the winding mountain road section of 15km. The region where the road passes has stretching sand dunes, and has high temperature and water shortage. The maximum temperature reaches 58℃. A set of effective road construction process for the desert region with water shortage is summarized during construction, the task is completed with high quality, and it is highly praised by the international supervisor and the owner of Egypt Sable Company.