Liaoning Panhai Expressway
时间:2018-11-14 source:本站
Commencement time:1999-11-1
Completion time:2001-5-30
Introduction:The starting point K71+000 of the
route in this contract is located in Xiatutai Village of Gaokan Town, and the
terminal point K79+455.36 is located in Qiankanzi Village of Huzhuang Town. The
total length is 8.455km, and the main structures include a large bridge and two
medium bridges. There is a Dashi Bridge hub interchange at the terminal point,
and the interchange serving for Dashi Bridge City has the single horn shape.
Dashi Bridge hub interchange is the control point of the whole project, and the
subgrade is the filling subgrade. It has the four-lane standard with width of
26m. The small bridge, culvert and subgrade are the same, and the width of the
large and the medium bridges is 25.5m.