Beijing-Shanghai Expressway Phase I Project Lot 3
时间:2018-11-14 source:本站

Commencement time:2004-3-15

Completion time:2005-9-30

Introduction:The total length of embankment grand bridge of the project is 2266m, the lower structure form of the bridge is: Φ1.5m (13# to 24# piers have Φ1.8m), cast-in-place pile foundation, partial tie beam or bearing platform, circular pier stud (Φ1.5m and Φ1.2m), bent cap. The embedded ribbed slab abutment is adopted for 0# abutment. The upper structure form is: precast and installed post-tensioned prestressing simply supported-to-continuous small box girder, cast-in-place prestressed concrete box girder and cast-in-place common concrete box girder. The bridge deck pavement is 6cm C40 waterproof concrete.