Yunnan Mengwenyan Expressway Project
时间:2018-11-14 source:本站


Commencement time:2014-11-1

Completion time:2017-5-31

Introduction:The total length of the left line is 10.93km, and the total length of the right line is 10.88km. The construction scope includes 1 interchange, 2 long channels, 1 middle channel, 6 subgrade sections, 5 large bridges, 1 medium bridge, 16 culverts, 2 channels and 2 overpasses.