300,000DWT Ore Berth Project of Lanshan Port Area of Rizhao Port
时间:2018-11-14 source:本站
Commencement time:2009-11-1
Completion time:2010-10-16
Introduction:The total length of the caisson
launching slide is 190.02m, and has the slope gravity riprap dike structure,
and the upper is the prefabricated installation grillage beam; the total length
of the caisson shipping dock is 59.96m, and has the gravity type block
structure; 150,000DWT bulk cargo berth has the total length of 366.84m, and has
the gravity type caisson structure.