Commencement time:2004-5-9
Completion time:2005-9-30
Introduction:The project has the slope type breakwater structure, and the total length of the north sand control dam is 10,905m. The crest elevation of the section of the project is +3.50m, and the length is 5.87km, including replacement of the sand cushion, arrangement of the plastic drainage board, pavement of the geotextile, throwing of the core stone and rock mattress, pavement of protective covering of the barrier board and so on. The top width of the sloping dike is 5m, and the top has the cast-in-place L-shaped concrete breast wall.