Commencement time:2007-3-20
Completion time:2007-9-20
Introduction:The project is the taxiway link between No.1 runway and the east of the east parallel taxiway of No. 3 runway. The project includes 5 taxiway link road junction groups and drainage engineering and auxiliary facility engineering in various road junctions. The total area of the road junction is 52998 m2.